EXPRESSION OF INTEREST (EOI)
FROM
STATE ELECTRICITY BOARDS/POWER GENERATION COMPANIES,
INDEPENDENT POWER PRODUCERS (IPP), POWER PLANT DEVELOPERS, CAPTIVE POWER
PRODUCERS, OR THEIR AUTHORISED REPRESENTATIVES
FOR
"OFFERING THEIR COAL BASED THERMAL POWER PROJECTS
FOR POSSIBLE ACQUISITION BY NTPC
EOI No.: BD/M&A/01 Dated:
21.02.2014
1.0 Introduction:
Indias largest power company, NTPC has an installed capacity of 42454 MW
comprising of 22 Coal based and 8 Gas based projects. NTPC has massive
ongoing capacity addition plans with around 20000MW projects under
construction. The company is also contemplating increasing its generation assets by means
of acquisition of Coal based Power Projects in India and abroad.
2.0 Expression of Interest:
Expression of Interest
is invited from State Electricity Boards/Power Generation Companies,
Independent Power Producers, Power Plant Developers, Captive Power Producers, or
their Authorised Representatives for offering their Operational/Commissioned/Synchronised/Under
Construction/under Planning Coal Based Thermal Power Projects (based on domestic,
imported as well as mix of domestic and imported coal) in India and abroad having
requisite Land, firm Fuel and Water linkages, Statutory clearances and Power
Purchase Agreement (PPA) in place for acquisition by NTPC.
3.0 Purpose of Inviting EOI:
Through this EOI, NTPC intends to
identify the suitable Power Projects, as specified in Clause 2.0 above, to
carryout preliminary due diligence and shortlist these projects which qualify
for carrying out detailed due diligence for a possible acquisition.
4.0 Eligibility:
Any State Electricity
Board/ Power Generation Company, Independent Power Producer, Power Plant
Developer, Captive Power Producer or their Authorised Representatives are
eligible for offering their Operational/Commissioned/Synchronised/Under
Construction/Under Planning Coal Based Thermal Power Projects having requisite
Land, firm Fuel and Water linkages, Statutory clearances and Power Purchase
Agreement (PPA) in place.
5.0 Required Information
Interested parties are required to submit the
information complete in all respects for attributes specified in the enclosed format (Refer Annexure-A).
The furnished information shall be well supported with relevant documents like
proof of land possession, copies of Fuel and Water Linkages, PPA entered etc.
6.0 Each page of the documents submitted shall be duly
authenticated by the applicant.
7.0 The language of submission of applications shall be in
English.
8.0 All Financial Data shall be given in Indian Rupees only.
9.0 Prospective parties may submit their Expression of Interest along
with relevant details as sought in the data sheets in soft form through email
latest by 3rd April 2014 followed by three (3) hard copies (1 Original + 2 Photocopies) in a sealed
cover super scribing Expression of
Interest (EOI) for " OFFERING
COAL BASED THERMAL POWER PROJECTS FOR POSSIBLE ACQUISITION BY NTPC
by 7th April 2014 at the address
given below:
General Manager (Business Development)
NTPC Limited
Core 3, 5th Floor
Scope Complex, Lodhi Road
New Delhi 110003, India
Email ID: charanjitsingh01@ntpc.co.in or charanjitsingh@ntpceoc.co.in
Phone No. : 011-24368810
Fax No. : 011-24360759
10.0 Confidentiality
All information provided by one
party to the other in connection with the negotiation or performance of this
EOI will be treated as confidential and will not be disclosed to any third
party without the other party's prior written consent, which consent may not be
unreasonably withheld.
11.0 Disclaimer
Issue of this document does not in any way
commit or otherwise oblige NTPC to proceed with all or any part of a tender
process. The EOI Request is not the subject of any process contract or any
contractual obligations between NTPC and the applicants to the EOI. Further,
NTPC may, at its absolute discretion either modify or abandon any part or whole
of the document and / or process, without giving prior notice to any or all the
applicant.
All Expression of Interest documents, upon submission by
any applicant to this EoI shall become the property
of NTPC. NTPC is not liable for any costs or compensation in relation to the
consideration of this EoI.
Annexure-A
Format for Submission
of Information
Developer/Owner: |
|
Name of Project: |
|
Capacity: |
|
Location: |
|
Parameters |
Details to be filled up by Offerer |
(1) Power Purchase Agreement |
|
a)
PPA signed for the Project |
(Yes/No) |
b)
Basis of PPA |
CERC/SERC/Competitive
Bidding |
c)
Quantum of power for which PPA has been
signed (Whether 100% or 70-99% or 50-70% or <50%) |
.% |
d)
Quantum of power for which PPA is yet to be
entered |
. MW |
(2) Land |
|
a)
Total Land envisaged for the project |
. Acres |
b) Land acquired
and possessed, free from all encumbrances |
. Acres |
c)
Land acquired but to be possessed, free
from all encumbrances |
. Acres |
d) Land
under forest area |
(Yes/No)
. Acres of
Forest Land |
e) Land
proposed to be acquired |
. Acres |
(3) Coal |
|
a) Total coal
envisaged for the project |
.. MMTPA |
b) FSA
signed for Long Term Firm Coal Linkage |
Yes/No |
c) If yes,
quantum, tenure and other specific conditions, if any |
|
d) Is there
Captive Mine/ Allocated Mine for the Project |
(Yes/No) |
e) If Yes,
Capacity of such coal mine, status of clearances/ mine development/ MDO
appointment |
|
(4) Statutory
Clearances |
|
a) All
clearances Obtained |
(Yes/NO) |
b) If No,
MOEF Clearance Obtained |
(Yes/NO) |
(i)
Forest Clearance Obtained |
(Yes/NO) |
(ii)
Clearance from AAI |
(Yes/NO) |
(iii)
Defense
Clearance |
(Yes/NO) |
(iv)
Mega Project Status Obtained |
(Yes/NO) |
c) Enlist
clearances yet to be obtained |
|
(5) Water |
|
a) Total
Water envisaged for the Project |
Cusecs |
b) Water
allocation approved from both State and CWC authorities |
Cusecs |
c) Water
allocation approved from State authorities |
Cusecs |
d) Water
allocation approved from CWC authorities |
Cusecs |
e) Water
Linkage yet to be obtained |
Cusecs |
(6) Project
Details |
|
a) Planned
Capacity (Phase wise) |
Phase-I:
..MW Phase-II:
..MW Phase-III:
..MW |
b) Unit
size |
. MW |
c) Project Implementation
Status |
Fully
Commissioned/Partly Commissioned/ Under Construction/ Under Planning |
(i)
Capacity under Operation |
. MW |
(ii)
Capacity under Erection & Commissioning |
. MW |
(iii)
Capacity under planning/ future expansion |
. MW |
d) Power
Evacuation: Details of power evacuation system and its readiness |
|
e) Suppliers
for the Project |
|
(i)
Supplier Name, Make of the SG package
awarded/ proposed to be awarded |
..
..
.. |
(ii)
Supplier Name, Make of the TG package
awarded/ proposed to be awarded |
.
. |
(iii)
Supplier Name, Make of the BoP package(s)
awarded/ proposed to be awarded |
..
|
(iv)
Agency for Erection &Commissioning of
the SG Package as above |
.. |
(v)
Agency for Erection &Commissioning of
the TG Package as above |
. |
(vi)
Agency for Erection &Commissioning of
the BoP Package(s) as above |
.. |
(7) Project
Cost |
|
a) Estimated
cost for the project |
Rs.
. Cr |
b) Expected
cost of completion |
Rs.
. Cr |
c) Capex incurred till date |
Rs.
. Cr |
(8) Project
Financing |
|
d) Debt/Equity
Ratio |
|
e) Source
of equity |
|
f)
Details of Debt Funding |
|
(i)
Whether the loan agreement has been signed |
|
(ii)
Details of Lenders |
|
(iii)
Quantum, tenure, interest rate and other
specific conditions of loan agreement |
|
(9) Estimated
Cost of Generation |
|
(i)
First Year Fixed Charge (FC) |
Rs
./Unit |
(ii)
First Year Variable Charge (VC) |
Rs
./Unit |
(iii)
First Year Cost of Generation (FC+VC) |
Rs
./Unit |
(10) Manpower
status for the project |
|
a) Total
Manpower on permanent employment |
. Nos |
b) Total
Manpower on Contract Basis |
. Nos |
(11) Legal/R&R/Law
& Order issues |
|
c) Details
of pending litigations, if any |
|
d) R&R
issues, if any |
|
e) Law
& Order issues, if any |
|