10 Please confirm if one Display Board is
required at State PCB?
Not required at State PCB
11 Cl. No. 13(a) or 13(b)? Please confirm which specifications to
follow if only one Display Board is
required – Cl. No. 13(a) or 13(b)?
please follow CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 13 (A)
12 Please confirm the number of AAQMS
required.
ONE set CAQQMS at Hazaribag.
13 Clause 8 in page 5 of 8;
Warranty
Is warranty period one year? Please refer CAAQMS technical
spec, scope of work, term &
condition.pdf page 5 of 8 clause
no. 8
14 Clause 4(d) in page 4 of
8; Shelter
Is shelter in bidder scope. The
Technical evaluation sheet in page 7 of
8 does not include shelter.
Shelter Is in bidder scope. please
go through CAAQMS
SPECIFICATION BY CPCB.pdf
15 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 13
Please clarify quantity of 2 Ton air
conditioners. Is it 1 no. or 2 nos. In
technical specs the quantity is 2 nos.
Please refer CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 2.1
16 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 13
Please clarify quantity of 1 Ton air
conditioners. Is it 1 no. or 2 nos.
Please refer CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 2.2
17 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 15
UPS for air conditioner is considered as
10 KVA with one hour back up. Please
confirm.
Please refer CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 3.1
18 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 15
UPS for analyzers is considered as 5
KVA with two hours back up. Please
confirm.
Please refer CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 3.2
19 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 15
UPS for server is considered as 2 KVA
with two hours back up. Please
confirm.
Please clarify if local PC of CAAQMS
itself is server or separate server is
there. If separate server is there, is
NTPC providing it?
Please refer CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 3.2. Items to be
provided as per CAAQMS
SPECIFICATION BY CPCB.pdf for
CAAQMS station at Hazaribag
only.
20 Clause 17; Technical
evaluation sheet in page
7 of 8; Point 17; Display
board
Size of the display board requires to be
clarified. Is it 4’X7’ as appearing in
page 36 of 43 of CPCB specs or 8’X12’
as appearing in page 37 of 43 of CPCB
specs
Please note Items to be
provided as per CAAQMS
SPECIFICATION BY CPCB.pdf
clause no. 13. (A) for CAAQMS
station at Hazaribag only.
21 Clause 17; Technical
evaluation sheet in page
7 of 8;
In CPCB specs (43 pages) there are
specs for AQI, CISCO switch, Rack
server, 42U industrial rack, Access
Point, UTM etc., These are meant for
central system which is away from
local CAAQM station.
These items are not included in the
clause 17.
Are these items required to be
considered?
Items to be provided as per
CAAQMS SPECIFICATION BY
CPCB.pdf for CAAQMS station at
Hazaribag only.
Those bidders, who have already submitted their bid, may revise their submitted bid in GePNIC if some
changes need to be done with respect to above clarifications.