c) For dam/reservoir embankments/dyke, the height and quantities shall be considered
above formation level upto the top of dam/reservoir embankments/dyke for qualifying
requirements purpose. However, in case of ash dyke raising works, for both inward/
upstream & outward/ center line methods, the height of dyke shall be considered from
the stripped level of ash inside the lagoon for qualifying requirement purpose.
Formation level means bottom of stripped level for the dam/reservoir
embankments/dyke formation. The earth work in cut off trench (COT) shall be included
for quantity estimation for qualifying requirement under clause 1.2. However, the depth
of COT shall not be considered for the height calculation for qualifying requirement
under clause 1.1.
d) Wherever the earthen dams, reservoir embankments and ash dykes are constructed in
different contracts, the height applicable to individual contract only and not the
cumulative effect shall be considered for the purpose of determining compliance of
clause 1.1. For example where the contract is for raising an embankment, only the
raising portion shall be considered and not the earlier starter dyke.
e) In clause 1.0 above, the word “executed” means the Bidder should have achieved the
criteria specified in the qualifying requirements within the preceding seven (7) year
period even if the contract has been started earlier and /or is not completed / closed.
f) In clause 1.1 above, Bidder should have constructed entire 8.0m height of embankment
work specified in the qualifying requirements, within the preceding seven (7) years
period, even if the contract has been started earlier and/or is not completed /closed.
g) The “one (1) year period” means any continuous 12 months period. However, for two
(2) concurrent works the same 12 months period shall be considered.
h) In case of works stipulated in 1.2 above, the word “earthwork” shall mean earth/ash.
The quantity of earth work in filling only will be considered for qualification.
i) In clause 1.1 above “Dyke work of maximum height not less than 8.0 m” covers height
of 8 m and/or above 8 m.
2.0) Financial Criteria:
2.1) The average annual turnover of the bidder, in the preceding three financial years as on the
date of Techno-Commercial bid opening shall not be less than Rs. 4732 Lakhs (Rupees Four
Thousand Seven Hundred Thirty-Two Lakhs only.)
2.2)
In case a Bidder does not satisfy the annual turnover criteria, stipulated above on its own,
its Holding Company would be required to meet the stipulated turnover requirements as
above, provided that the Net Worth of such Holding Company as on the last day of the
preceding financial year is atleast equal to or more than the paid-up share capital of the
Holding Company. In such an event, the Bidder would be required to furnish along with its
Techno-commercial bid, a Letter of Undertaking from the Holding Company, supported by
the Holding Company's Board Resolution, as per the format enclosed in the bid documents,
pledging unconditional and irrevocable financial support for the execution of the Contract by
the Bidder in case of award.
2.3)
Net Worth of the bidder should not be less than 100% of the bidder's paid up share capital
as on the last day of the preceding financial year on the date of Techno-commercial bid
opening. In case the Bidder meets the requirement of Net worth based on the strength of
its Subsidiary(ies) and/or Holding Company and/or Subsidiariy (ies) of its Holding
Companies, wherever applicable, the Net worth of the Bidder and its Subsidiary(ies) and or
Holding Company and/or Subsidiary(ies) of the Holding company, in combined manner
should not be less than 100% of their total paid up share capital. However individually, their
Net worth should not be less than 75% of their respective paid up share capitals.
2.4)
Net worth in combined manner shall be calculated as follows: